All Portfolio


Nextenaga Sdn Bhd
Uniqueness: PV design suit to original plantation infrastructure
Capacity: 29.99MWac
Manpower: 15 management personnel & 100 technical site personnel
Duration: Dec 2022 - On going
Roles: EPCC
System: Fixed Tilt Ground Mounted with Central Inverters
Area: Bestari Jaya, Selangor
Work scope:
Local Authority Application:
• Prepare and submit local authority application such as Development Order, Building Plan, etc.
Engineering:
• Overall PV system design inclusive 33kV interconnection facility, solar farm infrastructural and building.
Procurement:
• Material procurement and logistic
Construction:
• Overall construction of infrastructural and building works, erection of PV system, install 33kV interconnector facility to PMU.
Commissioning:
• Test and commission for the Solar Power Plant.

Nextenaga Sdn Bhd


LSS TPG Sdn Bhd
Uniqueness: Mounting Structure with RC Piling direct on Soft Ground Solution.
9.3 km interconnector cable across JKR road, SKVE and WCE highway.
Capacity: 26MWac
Manpower: 10 management personnel & 100 technical site personnel
Duration: March 2023 - On going
Roles: EPCC
System: Fixed Tilt Ground Mounted with string inverters
Area: Jenjarom, Selangor
Work scope:
Local Authority Application:
• Prepare and submit local authority application such as Development Order, Building Plan, etc.
Engineering:
• Overall PV system design inclusive 33kV interconnection facility, solar farm infrastructural and building.
Procurement:
• Material procurement and logistic
Construction:
• Overall construction of infrastructural and building works, erection of PV system, install 33kV interconnector facility to PMU.
Commissioning:
• Test and commission for the Solar Power Plant.

LSS TPG Sdn Bhd


Sabah Energy Corporation Sdn Bhd
Uniqueness: First Undulating Profile Fixed Tilt Design in Labuan Island
Capacity: 5MWac
Manpower: 8 management personnel & 50 technical site personnel
Duration: April 2022 - On going
Roles: EPCC
System: Fixed Tilt Ground Mounted with string inverters
Area: Tanjung Cubing, Labuan
Work scope:
Local Authority Application:
• Prepare and submit local authority application such as Development Order, Building Plan, etc.
Engineering:
• Overall PV system design inclusive 33kV interconnection facility, solar farm infrastructural and building.
Procurement:
• Material procurement and logistic
Construction:
• Overall construction of infrastructural and building works, erection of PV system, install 33kV interconnector facility to PMU.
Commissioning:
• Test and commission for the Solar Power Plant.

Sabah Energy Corporation Sdn Bhd


NEDA Power (Sg Tiang) Sdn Bhd
Uniqueness: Afrophotovoltaics for dual-use area for solar and agriculture, 1st NEDA Project
Capacity: 8MWac
Manpower: 8 management personnel & 50 technical site personnel
Duration: July 2022 - On going
Roles: EPCC
System: Fixed Tilt Ground Mounted with string inverters
Area: Pendang, Kedah
Work scope:
Local Authority Application:
• Prepare and submit local authority application such as Development Order, Building Plan, etc.
Engineering:
• Overall PV system design inclusive 33kV interconnection facility, solar farm infrastructural and building.
Procurement:
• Material procurement and logistic
Construction:
• Overall construction of infrastructural and building works, erection of PV system, install 33kV interconnector facility to PMU.
Commissioning:
• Test and commission for the Solar Power Plant.

NEDA Power (Sg Tiang) Sdn Bhd


PKNP Reneuco Suria Sdn Bhd
Uniqueness: Raise platform 160acres for ilood mitigation
Capacity: 50MWac
Manpower: 20 management personnel & 250 technical site personnel
Duration: Feb 2023 - On going
Roles: EPCC
System: Fixed Tilt Ground Mounted with string inverters
Area: Pekan, Pahang
Work scope:
Local Authority Application:
• Prepare and submit local authority application such as Development Order, Building Plan, etc.
Engineering:
• Overall PV system design inclusive 132kV interconnection facility, solar farm infrastructural and building.
Procurement:
• Material procurement and logistic
Construction:
• Overall construction of infrastructural and building works, erection of PV system, install 132kV interconnector facility to PMU.
Commissioning:
• Test and commission for the Solar Power Plant.

PKNP Reneuco Suria Sdn Bhd


Ranhill Solar I Sdn Bhd
Uniqueness: Undulating Profile up to 30 egrees gradient Fixed Tilt Design
Capacity: 50MWac
Manpower: 20 management personnel & 250 technical site personnel
Duration: March 2022 - On going
Roles: EPCC
System: Fixed Tilt Ground Mounted with string inverters
Area: Nibong Tebal, Pulau Penang
Work scope:
Local Authority Application:
• Prepare and submit local authority application such as Development Order, Building Plan, etc.
Engineering:
• Overall PV system design inclusive 132kV interconnection facility, solar farm infrastructural and building.
Procurement:
• Material procurement and logistic
Construction:
• Overall construction of infrastructural and building works, erection of PV system, install 132kV interconnector facility to PMU.
Commissioning:
• Test and commission for the Solar Power Plant.

Ranhill Solar I Sdn Bhd


JAKS Nibong Tebal Sdn Bhd
Uniqueness: The Largest Undulating Profile Fixed Tilt Design in Penang State
Capacity: 50MWac
Manpower: 20 management personnel & 250 technical site personnel
Duration: March 2022 - August 2023
Roles: EPCC
System: Fixed Tilt Ground Mounted with string inverters
Area: Nibong Tebal, Pulau Penang
Work scope:
Local Authority Application:
• Prepare and submit local authority application such as Development Order, Building Plan, etc.
Engineering:
• Overall PV system design inclusive 132kV interconnection facility, solar farm infrastructural and building.
Procurement:
• Material procurement and logistic
Construction:
• Overall construction of infrastructural and building works, erection of PV system, install 132kV interconnector facility to PMU.
Commissioning:
• Test and commission for the Solar Power Plant.

JAKS Nibong Tebal Sdn Bhd


IB Vogt
Uniqueness: The Largest & Highest Tracking System
Capacity: 100MWac
Manpower: 12 management personnel & 200 technical site personnel
Duration: Aug 2021 - Completed
Roles: Sub-contractor for solar farm side (Mechanical, 33kV & Testing)
System: Solar Trackers System with string inverters
Area: Marang, Terengganu
Work scope:
Civil & Structure:
• Manage laydown area and manage inland distribution.
Mechanical Installation:
• Welding of piles, tracking systems & solar panels.
Electrical Installation:
• Install & terminate AC cable, FO cable up to 33kV to SIF.
• Install the grounding and earthing system.
• Install and commission of PPC.
Others:
• Maintain HSE of site.
• Test and commission for the scope above.
• Prepare as built drawings and all the test reports.
• Assist client on Hot Commissioning, BE preparation, switching and energize of Transformer station & COD.

IB Vogt


Halpro Engineering Sdn Bhd (Greencell)
Uniqueness: First Largest Bifacial with Tracking System
Capacity: 44MWdc (30MWac)
Manpower: 8 management personnel & 300 technical site personnel
Duration: May 2020 - Oct 2020
Roles: Main contractor for solar farm side (From Mechanical up to 33kV)
System: Solar Trackers System with string inverters
Area: Pekan, Pahang
Work scope:
Civil & Structure:
• Manage laydown area and manage inland distribution.
Mechanical Installation:
• Install piles, tracking systems & solar panels.
Electrical Installation:
•Install & terminate inverters, solar loggers and weather stations.
• Install & terminate DC, AC cable, FO cable up to 33kV to SIF.
• Install the grounding and earthing system.
• Install and commission of PPC.
Others:
•Maintain HSE of site.
• Test and commission for the scope above.
•Prepare as built drawings and all the test reports.
• Assist client on Hot Commissioning, BE preparation, switching and energize of Transformer station & COD.

Halpro Engineering Sdn Bhd (Greencell)


RE Gebeng Sdn Bhd
Uniqueness: One of the first COD among LSS2
Capacity: 39MWdc (30MWac)
Manpower: 4 management personnel & 150 technical site personnel
Duration: Feb - Sep 2019
Roles: Main contractor for solar farm side (From Mechanical up to 33kV)
System: Flat solar farm with string inverters
Area: Gebeng, Pahang
Work scope:
Design:
• Design of DC Management System.
• Design of cable trenches & verify cable calculation.
Mechanical Installation:
• Install ground mounted structure & solar panels.
Electrical Installation:
• Install & terminate inverters, solar loggers and weather stations.
• Install & terminate DC, AC cable, FO cable up to 33kV to SIF.
• Install the grounding and earthing system.
• Install and commission of PPC.
Others:
• Maintain HSE of site.
• Test and commission for the scope above.
• Prepare as built drawings and all the test reports.

RE Gebeng Sdn Bhd


Kenyir Gunkul Sdn Bhd
Uniqueness: Soft Soil Condition
Capacity: 39MWdc (30MWac)
Manpower: 5 management personnel & 200 technical site personnel
Duration: Oct 2019 - July 2020
Roles: Main contractor for solar farm side (From Mechanical up to 33kV)
System: Flat solar farm with string inverters
Area: Paka, Terengganu
Work scope:
Design:
• Design the Solar Farm.
•Draw and prepare the whole solar farm drawings.
Mechanical Installation:
• Install ground mounted structure & solar panels.
Electrical Installation:
• Install & terminate inverters, solar loggers and weather stations.
• Install & terminate DC, AC cable, FO cable up to 33kV to SIF.
• Install the grounding and earthing system.
• Install and commission of PPC.
Others:
• Maintain HSE of site.
• Test and commission for the scope above.
• Prepare as built drawings and all the test reports.

Kenyir Gunkul Sdn Bhd


Redsol Sdn Bhd
Uniqueness: Soft Soil Condition
Capacity: 45MWdc (30MWac)
Manpower: 4 management personnel & 100 technical site personnel
Duration: Sep 2019 - Jan 2020
Roles: Electrical contractor for solar farm side (From DC up to 33kV)
System: Flat solar farm with Central Inverters
Area: Bukit Merah, Perak
Work scope:
Electrical Installation:
• Install & terminate DC combiner box, solar loggers and weather stations.
• Install & terminate DC, AC cable and FO cable up to 33kV SIF.
• Install and commission oPPC.
• Install the grounding and earthing system.
Others:
• Maintain HSE of site.
• Test and commission for the scope above.
• Organize and manage inland materials distribution.
• Prepare as built drawings and all the test reports.